NemontYanacocha-1680x600.jpg

Newmont - Buenaventura Yanacocha

In 2017, the Newmont - Buenaventura mining company, located near the city of Cajamarca in northern Peru, requested a power study related to its expansion plan which requires an additional 80 MW (Year 2021).

Using an ETAP model, validated with the operating values ​​of the energy meters of the electrical system in operation, EISAC conducted a study focusing on the concepts of optimization that an electrical system must have for mining operations.

Buenaventura+Logo.jpg

The study analyzed eight future operating scenarios taking into account the concepts of reliability and energy quality, voltage levels, motor starting, power factor values ​​and real-time energy management, with the aim of optimizing the electrical system to operate at a lower cost and to minimize future investment in improving the electrical system.

The final report of the study gave a list of conclusions and recommendations to be implemented in the future.

Other studies conducted for Newmont Buenaventura-Yanacocha:

2007 - Gold Mill Study, 1st Stage.
2008 - Gold Mill Study, 2nd Stage.